Give tendering the infrastructure
sales has had for years.

Never start from a blank page again.
Find, evaluate, and respond from a winning position.

The complete system for winning work.

Every tender, from intake to forecast, managed in a single commercial process.

Discover

No more digest chaos. Unified view of every tender, contract, purchaser, and supplier.

Explore discovery

Tenders

Showing 1–7 of 170 results

Search Open

Local Food Systems Precinct – Block 15

AusTender

POL2024-506 Acoustic Engineers Panel

Vendor Panel

Audio Visual (AV) Upgrades

TenderSearch

Qualify

Evaluate in seconds. Your team actually sticks to your bid/no-bid criteria.

Explore qualification

Qualification Matrix

Go/No-Go Analysis

Active
Budget Alignment85%
Capability Match92%
Win Probability68%

GO

Recommended Action

Respond

We don't just help teams write faster. We help them engineer winning responses.

Explore response

RFP_TenderManagement.pdf

Ready
AI Assistant
Draft response for 3.2.1 secure document storage
Tendl provides AES-256 encrypted storage with SOC 2 Type II compliance. All documents are versioned and auditable...
Send

Manage

We turn tendering into a weighted, forecastable revenue pipeline.

Explore pipeline

Revenue Pipeline

Commercial Visibility

Live

Weighted Forecast

$18.4M

12
8
5
3
1

Tenders

Showing 1–7 of 170 results

Search Status ▾ Open

Local Food Systems Precinct – Block 15 Section 38 Fyshwick

26 Mar 2026

AusTender

POL2024-506 Acoustic Engineers Panel

16 Feb 2026

Vendor Panel

Audio Visual (AV) Upgrades – Sfera's Convention Centre

16 Feb 2026

TenderSearch

Plant Equipment – 3.5 Tonne Towable Mini Excavator

23 Feb 2026

Email Forward

Managed Print Services – Whole of Government

10 Mar 2026

AusTender

Stormwater Drainage Upgrade – Stage 2 Civil Works

4 Mar 2026

Vendor Panel

ICT Security Assessment & Penetration Testing

28 Feb 2026

TenderSearch

Qualification Matrix

Go/No-Go Analysis

Active
Discovery
Qualified
Pipeline
Budget Alignment85%
Capability Match92%
Win Probability68%

GO

Recommended Action

RFP_TenderManagement.pdf

247 requirements Ready

Extracted Requirements

3.2.1Secure document storage
4.1.3Data privacy compliance
5.2.7AI-generated first drafts
6.1.2Collaborative editing
7.3.4Role-based access

18

Must/Shall

100%

Extracted

AI Assistant 3 evidence docs attached
Draft response for 3.2.1 secure document storage
Tendl provides AES-256 encrypted storage with SOC 2 Type II compliance. All documents are versioned, access-controlled, and auditable per ISO 27001 standards.
Send

Revenue Pipeline

Commercial Visibility

Live

Weighted Forecast

$18.4M

12
8
5
3
1
Discovery
Qualified
Response
Submitted
Award

Trusted by teams at

Run tendering properly.

Traditional tendering is messy. Tendl makes it structured. Outcomes improve.

A tangled grey rope that straightens and turns into a green arrow

The traditional way

Blindsided by the ATM
Everything is a must win
Gut-feel go/no-go
Spreadsheet chaos
Missed deadline

The Tendl way

Governed evidence

Keep evidence governed and audit-ready

Bid discipline

Lead with clear go/no-go criteria

Forecast visibility

See your win forecast in one view

Outcomes

90% faster

tender development time

50% lower cost

by focusing on winnable work

Revenue visibility, earlier

by spotting dips sooner

The traditional way

Blindsided by the ATM
Everything is a must win
Gut-feel go/no-go
Spreadsheet chaos
Missed deadline

The Tendl way

Governed evidence

Keep evidence governed and audit-ready

Bid discipline

Lead with clear go/no-go criteria

Forecast visibility

See your win forecast in one view

Outcomes

90% faster

tender development time

50% lower cost

by focusing on winnable work

Revenue visibility, earlier

by spotting dips sooner

When tendering is treated as sales.

Client outcomes, industry coverage, and our perspective on where tendering is heading.

Case Evidence
"Development time for tender responses dropped by up to 90%. What previously took several weeks was completed in a matter of days. Automated checks ensured all mandatory requirements were addressed, and multiple contributors could work simultaneously, reducing bottlenecks and ensuring rapid turnaround."
Hyde Park Solutions Hyde Park Solutions (HPS)
Read the case study
Insights

AI Is a Multiplier. What Is It Multiplying in Your Team?

"AI accelerates output, but it does not fix weak qualification or positioning. It multiplies whatever system your bid team already runs."
Read the article
Feature Updates

Requirement and Risk Highlighting

"Automatically extract mandatory requirements, evaluation criteria, and legal red flags before writing begins."
Read the update
From The Founder

Tendering is Sales — Stop Calling It 'Winning Work'

"Why the language you use around tendering shapes how your organisation treats it, and why calling it 'winning work' hides the commercial reality."
Read the post
Press Coverage

Travel Insider: Tendl — Re-engineering How Organisations Win Work

"Travel Insider profiles Tendl and its mission to reshape how organisations approach tendering and revenue growth."
Read the coverage
Hyde Park Solutions case study AI Is a Multiplier Requirement and Risk Highlighting Tendering is Sales Travel Insider coverage

From sign-up to structured in 30 minutes.

Configure your workflow, import your library, and launch your first bid.

Setup 2 of 3
Company profile
Team members
Bid preferences
Continue

Commercial Onboarding

30-minute setup session with Customer Success or new Guided AI.

Integrations 3 sources
SharePoint Connected
HubSpot Connected
Upload Add

3 sources synced

Connect Your Evidence

Securely connect SharePoint or upload directly. Documents are governed, version controlled, and structured into reusable assets.

Ready
to Bid
Documents Responses
SH

Capability (Relevant Experience)

Demonstrated experience across utilities and gov...

BN

Software

Location: QLDCouncil
LN

WHS Capability Statement

Our WHS management system is certified to ISO 45001...

JR

Local Supplier

Location: QLD

Build Your Response Library

Replicate what good looks like. Draw from your gold standard responses.

Impact, measured.

Four outcomes teams see after moving to a structured workflow with Tendl.

Up to 90%

Reduction in tender development time

Complex utility contracts (case study).

Inside 30 days

Live weighted revenue forecast

Typical onboarding and rollout timeframe.

Win rate improvement

When qualification + reuse is applied consistently.

2–3 hrs/day

Saved per day by managers

Less chasing, fewer rewrites, cleaner approvals.

We'll show how each metric is measured in your demo.

Built with top-tier security and scalability

ISO 27001

Enterprise-grade security with ISO 27001 certification. Your data is protected by industry-leading standards.

No AI Training

Your data is never used to train AI models. Your competitive intelligence stays yours alone.

Data Residency You Control

Your data, your jurisdiction. Host in the EU, US, or Australia with complete sovereignty over where your information resides.

See Tendl in action.